PROJECT CHOMA - LED Installation

With the frames successfully mounted onto the water tower, the next phase of the project involved the installation of the digital displays by Africa Union Technologies. Given the height of the tower, a 20-meter cherry picker was required to facilitate the installation process. However, strong winds occasionally caused work to halt temporarily for safety reasons. Despite this challenge, the team was able to complete one side of the installation in a single day, with the entire installation of both sides taking two days in total.