top of page

PROJECT CHOMA - Structure challenges


At the onset of the project, a significant setback was uncovered as we discovered that the legs of the water tower had badly rusted underground. In order to ensure long-term support for the two 768kg screens, the rust had to be repaired and counterweights had to be employed. This was necessary to maintain the structural integrity of the tower and ensure the safety of the installation. Despite this initial challenge, the project team was able to overcome the obstacle and proceed with the installation of the digital signage.

bottom of page